    If it’s worth anything I recommend Justin Dollar. Starting with a GC is a good idea. Bid out your project and get many ideas before moving forward that way you don’t chamge plans in the process.

    #2884
    Bootstrap
    Participant

    Your insurance company and lender, if any, will also want to make sure you have the proper permits… not just the County.. 😉
    …and you have to disclose any non-permitted construction when you go to sell your property, which could affect it’s value … 😉

    • This reply was modified 9 years, 11 months ago by Bootstrap.
    • This reply was modified 9 years, 11 months ago by Bootstrap.
    #2883
    Aleon
    Participant

    Hello, My name is Allen Shaw. I am a local general contractor that does Design – AutoCad drafting – Construction all in house………I can provide a complete packet for the county permit and finish the project to any stage as required. I have just finished a project that is what your looking aat and would be glad to take you be and answer any questions you have, as well as provide you with a proposal for your own project. Thank you for your time…..Allen Shaw
    http://www.allenshawconstruction.com

    PS. I live here in Dorrington and have been here for over 35 years.

    #2873
    cabin
    Participant

    And decks built 3 years ago did not need an engineer to plan them. With our stable soil, piers, posts and joists, sizes and spans are all listed in charts which anyone can look up online and the building dept has all those same charts. The county building department helps generate income for engineers it seems to me. Oh well…

    #2872
    allen
    Participant

    @caleach – Whatever you decide to do, all the county wants is permit money. And more permit money. Oh, did I mention permit money? It’s amazing how there are cabins in Dorrington built in the 1940s and 1950s that are still standing. No permits required back then.

    #2871
    caleach
    Participant

    Thankyou very much for all the comments and suggestions. I will try to remember to post what we go through

    #2870
    Camp Con
    Participant

    Rob Westerhoff, an architect in Murphys. We used his services, and he was very good.

    #2869
    CalBear
    Participant

    Try Justin Dollar as well … http://www.jgdollar.com or at 795-5191 … They do it all from septic, foundations to remodels/additions and new construction, including design work. As several posters commented, reach out to a number of contractors to seek out their input and approach, along with different options and costs.

    Unfortunately the value is something hard to gauge in this market, the most important factor is this something that will enable you to enjoy your cabin more, perhaps allow for more guests and family to visit. Construction costs are still very high, versus existing properties for sale. So the return, in my opinion, really needs to be balanced by your personal goals to make it worthwhile.

    #2868
    cabin
    Participant

    Just FYI there will be many things to consider.
    If your garage is detached and has electrical for a normal garage you will probably need more circuits or more practically a sub panel at the garage for the living area. You will need heat and hot water in the new area which means more elec or propane.
    Septic could be another issue depending on size and location. Usually they are sized by how many bedrooms the house has.
    With luck the garage will have been built adequately to support a second story.
    I have heard that sometimes a separate living area detached from the main house can be called a second home and zoning might be an issue. It often has to do with a whether there is a kitchen or not but I don’t know about Calaveras county specifically.
    Good luck with your project and I hope all works smoothly.

    #2865
    Bootstrap
    Participant

    I would recommend you start with a local Architect, since you need a design, permit, and possible HOA review before you can start construction. Architects deal with the exact issues you are having…feasibility and value. They are also familiar with building codes and consult with engineers, when required… If you really want that extra bath, you may need a separate septic system or a pumped system, if you can’t get enough fall to drain to your existing system.

    Once you have a feasible design, you can solicit bids from several contractors and make your choice.

    • This reply was modified 9 years, 11 months ago by Bootstrap.
    • This reply was modified 9 years, 11 months ago by Bootstrap.
    #2864
    Flyfishr
    Participant

    Steve –
    the contractors should be your first line of contact, whichever you decide to select. Contact several, and take note of their advise. Contacting a contractor is not an obligation to use their service, and they would be more experienced to make recommendations to meet your needs.

    #2863
    caleach
    Participant

    While I pursue some of these leads I wonder if anyone base any experience they can share on the process.

    Our garage is detached from the house and on the other side of the lot from the septic system. We would like to be able to expand up and out a little over the garage and add a bnous room with a bath.

    We will have to deal with feasibility and value, is it woth it for the house?

    Any and all comments would be appreciated.
    Steve

    #2862
    caleach
    Participant

    Thanks for the tips, now I can start looking into the feasibility of it.

    #2861
    Robert Bansmer
    Participant

    I’ve used Jon Berger Construction, 770-0222, and have been very pleased.

    #2860
    Flyfishr
    Participant

    I agree about Canton Construction. He did extensive work for me a couple of years ago – siding, decks, windows and he and his son also did some wallboard repairs, wallpaper removal, and interior painting. Excellent job, and would use him again any time.

Viewing 15 posts - 1 through 15 (of 17 total)
  • You must be logged in to reply to this topic.